SiRay Energy

Commercial & Industrial Energy Storage Cabinets

One cabinet, three-phase, IP54, outdoors. Inside the GCB units: LFP cells, a hybrid PCS, thermal management and fire suppression. The GLC-261 is DC-side and takes an external PCS. Outside: a grid connection and a load that stops spiking your demand charge.

The C&I Energy Storage Cabinet Range

Scroll the table sideways to see every column.

Model Energy PCS Cooling Cycles Weight
GCB-E100 112.53 kWh 50 kW three-phase air 6000 cycles at 0.25C, 95% DOD, 25 °C 1300 kg
GCB-E240 241.15 kWh 125 kW three-phase air 6000 cycles at 0.25C, 95% DOD, 25 °C 2500 kg (excluding PCS)
GLC-261 261 kWh 130.5 kW, external PCS liquid 8000 cycles to 70% EOL about 3 t

What Commercial Battery Storage Does on Site

  • Peak shaving

    Discharge into the peak window, charge off-peak.

  • Backup

    Keep the line running when the utility drops.

  • PV self-consumption

    Store midday surplus, release it after sunset.

Peak Shaving and Demand Charge Management

Peak shaving discharges the battery during the site's highest-demand window and recharges it when the tariff is low, which caps the monthly kW peak that drives the demand charge. The integrated three-phase hybrid PCS does this automatically. The amount saved depends on the load profile and the tariff, so SiRay sizes from twelve months of interval load data and returns the payback with the quotation.

What We Need From You

  • Twelve months of interval load data, or a measured load profile
  • The tariff structure, including how the demand charge is calculated
  • The grid situation: stable, weak or absent
  • Available footprint and whether the cabinet can sit outdoors

Air-Cooled or Liquid-Cooled?

GCB-E100 and GCB-E240 use refrigeration, ventilation and heating and hold -20 to 50 ℃ at 75 dB or less. GLC-261 circulates a 50:50 ethylene glycol solution and holds cell temperature spread below 3 ℃, which is why it reaches 8000 cycles to 70% end of life. Choose liquid if you cycle hard every day.

Installation

All three cabinets are IP54 and sit outdoors on a slab. GCB-E100 is 1200 x 803 x 2375 mm. Three-phase four-wire, AC 380 V, 50 Hz, RS485 / CAN.

Get a Site Assessment

Common Questions

What is peak shaving and how much can it save?

Peak shaving uses a battery to discharge during the site's highest-demand window and recharge when the tariff is low, which caps the monthly kW peak that drives the demand charge. A SiRay GCB-E100 (112.53 kWh at 50 kW) or GCB-E240 (241.15 kWh at 125 kW) performs this automatically through its integrated three-phase hybrid PCS. The saved amount depends on the load profile and tariff, so SiRay sizes from twelve months of interval load data.

What is the difference between the GCB-E100, GCB-E240 and GLC-261 cabinets?

The GCB-E100 stores 112.53 kWh with an integrated 50 kW three-phase PCS and air cooling. The GCB-E240 stores 241.15 kWh with a 125 kW PCS and air cooling. The GLC-261 stores 261 kWh at 832 V, uses liquid cooling with a 50:50 ethylene glycol solution that holds cell temperature spread below 3 ℃, and is rated 8000 cycles to 70% end of life. All three are IP54; the GCB cabinets carry an integrated fire protection system and the GLC-261 uses aerosol suppression.

Can a C&I storage cabinet be installed outdoors?

Yes. All three SiRay C&I cabinets are IP54 and designed for outdoor installation on a slab. The GCB-E100 measures 1200 x 803 x 2375 mm and weighs 1300 kg, operates from -20 to 50 ℃, below 2000 m altitude, and runs at 90% or higher system efficiency.

Can a C&I storage cabinet be expanded or paralleled later?

Yes. The GCB-E100 and GCB-E240 each carry an integrated three-phase hybrid PCS, so a second cabinet adds energy and power instead of sharing one converter. The GLC-261 is a DC-side cabinet that pairs with an external PCS or a hybrid inverter, so its converter is sized together with the cabinet. SiRay sizes the first stage to the load you have today and issues a layout drawing that reserves the second cabinet position and cable route, so the slab and the LV connection are only built once. Share your five-year load plan when you request a quote.

What does the site need ready before a C&I cabinet can be installed?

A level slab that carries the cabinet mass, a low-voltage connection point for the PCS or hybrid inverter, clearance around the cabinet for airflow and service access, and a communication path for the EMS. All three SiRay cabinets are IP54, so no separate enclosure or building is needed. SiRay issues a foundation and termination drawing before shipment.

C&I Energy Storage Models Compared

Scroll the table sideways to see every column.

C&I Energy Storage compared
Model Rated energy Voltage Max power Cycle life IP rating Dimensions (mm) Weight Communication
GCB-E100 112.53 kWh nominal (314 Ah pack) / 100.35 kWh nominal (280 Ah pack) 358.4 V (7 module series) 50 kW 6000 cycles at 0.25C, 95% DOD, 25 °C IP54 1200 × 803 × 2375 mm 1300 kg RS485 / CAN
GCB-E240 241.15 kWh nominal (314 Ah pack) / 215.04 kWh nominal (280 Ah pack) 768 V (15 module series) 125 kW 6000 cycles at 0.25C, 95% DOD, 25 °C IP54 1300 × 1260 × 2375 mm 2500 kg (excluding PCS) RS485 / CAN
GLC-261 261 kWh 832 V (5-module series) 130.5 kW 8000 cycles to 70% EOL IP54 970 × 1420 × 2320 mm ≈3 t —
Request a Quote